Lower Level slab getting ready to pour. Upper level retaining walls laid out to build, and some footings trenched. Elevator shaft sizing confirmed.
Merano House Construction Update
Lower Level slab getting ready to pour. Upper level retaining walls laid out to build, and some footings trenched. Elevator shaft sizing confirmed.